The challenge of completing a $39 million, 160,000 square foot surgical training facility in less than 21 months made this project unique. The challenge was turned “Freefall” as a new approach to fast track construction. In less than nine months, 30 miles of conduit, almost 250 miles of cable, audio visual systems, fire alarm, security lighting, control power, power distribution, and emergency systems were installed.
Beacon Electric Company completed all of the electrical work on the 175-guest room aLoft Hotel, built at the corner of 1st & Main Streets in the heart of the ever growing downtown Louisville area. Read More
The CitiCorp installation consists of the Credit Card Processing Center. The electrical installation includes power lighting, distribution, fire alarm, parallel generators and UPS units and underfloor power modular wiring systems.